Roof-first design
Layout follows shade, structure, and the hours the building draws power.
Solar and renewable energy
Shiva Energy Solutions designs and installs rooftop solar for homes, commercial buildings, and industrial sites. The work covers the roof, the electrical room, and the care of the system after it is switched on.
Layout follows shade, structure, and the hours the building draws power.
You get the layout, the main equipment, and the order of work on paper.
Mounting, wiring, and commissioning happen in one clear sequence.
You keep a record of what was installed and how to check it later.
Waaree Energies Certified Partner
Services
Six kinds of work, from a single home roof to a site that uses power all day.
A home array laid out for the roof you have: its direction, its shade, and the hours the household actually uses electricity.
Solar for offices, schools, clinics, and shops that draw most of their electricity while the sun is up.
Larger rooftop or ground-mounted arrays planned around production hours, roof structure, and how power moves through the site.
Panel layouts that can include battery storage when selected loads need power after sunset or during an outage.
A shade check, a string layout, inverter selection, and drawings a structural reviewer and an electrician can use.
Scheduled visits and generation checks, with plain notes when output falls short of what the system should produce.
About
A useful system matches the building in front of you, not a page in a catalogue.
Shiva Energy Solutions works in solar and renewable energy. We start with the roof and the electricity bill, then stay with the practical parts: structure, wiring, and a handover the owner can follow.
The office is in New Delhi. Conversations about a project happen there, with the drawings and the bill on the table.
How it works
Five steps. Each one ends with something you can look at: a note, a drawing, or a system that is switched on.
Tell us about the building, the bills, and what you want the solar system to do.
We look at the roof or the land, the electrical room, and anything that would change the design.
You receive a written plan: the layout, the main equipment, and the order of work.
Mounting, wiring, and commissioning happen on site, and we walk the finished work with you.
You keep a record of what was installed and how the system is meant to be checked from then on.
Contact
Project conversations happen at the office in New Delhi. Bring a recent electricity bill if you have one. A photo or sketch of the roof helps. If some loads must stay on during an outage, say which ones.
Office address
Shiva Energy Solutions B-2/11, Block B, Block E, Mohan Cooperative Industrial Estate, Badarpur, New Delhi, Delhi 110044Contact No: 9811717610
Share your name, a way to reach you, and what the building needs. Required fields are marked.